 What is one of the first things that you teach people who are moving from Autocad to Revit?

"When making changes in Revit, DO NOT delete and replace elements - you should always modify the original elements even if it takes longer" 

Why is that?  Because you never know what data or hosted elements are attached to existing elements - so if you "Delete and Replace" you might lose the data or hosted elements.

  • What does the middle initial of BIM stand for?  "Information".
  • Without "Information" you are just working with a 3D Building Model

Revit Mirror Command

Revit is a BIM program, Right?

So you would imagine that it's fundamental command structure would work towards maintaining the BIM concept?

Unfortunately the "Mirror" Command in Revit doesn't follow the BIM rules.

It does not just mirror the selected element(s) - it copies and deletes original, even when Copy is unticked.

  • Select an element
  • Check it's Element ID

  • Mirror the element (with "Copy" unticked)
  • Check the Element ID of the mirrored element
  • Aargh, it is different

So what?  Well, it is just not BIM !


What does this Mean for your model?

Cut elements are no longer cut when mirrored

Joined elements are no longer joined when mirrored

etc

To test this:

  • Create a new family that has "Cut with Voids When Loaded" enabled:

  • Place a solid and void in the family (not intersecting each other)

  • Load the family into a project
  • Place a component where it intersects with another element (in this example, a wall of the same material)
  • Join the component and the other element (wall)
  • Cut the component and the other element (wall)
  • Mirror the component (No copy)
  • Component is no longer joined or cut

Compare to other Revit Commands

  • Undo the mirror command
  • Test the Move and Rotate commands (no copy)
  • Join and Cut are maintained


These commands are BIM compliant - original elements are manipulated

Hosted Elements are Deleted by Mirror Command

  • Add a dimension (or tag) to the component
  • Mirror (no copy) the component
  • If you are lucky you might get a warning about the impending loss of the hosted dimension


What to Do?  Is there a Workaround?

The first thing to do is to contact Autodesk and request that they fix this un-BIM-like behaviour

Despite this problem having existed for over 20 years, it will surely be fixed promptly for you if you ask nicely.

In the meantime . . . . .

There is another way to mirror components in Revit:

 

Control the Mirror Command

Families can have their own built-in mirror/flip controls.

In the family editor, place a "Control"




  • Reload the family
  • Select the component
  • Check its Element ID


  • Click on the Mirror control
  • The component will flip around its origin point
  • Check the Element ID
  • Woohoo - it is the same! 
  • And the Join and Cut are maintained

 

Flipping Hosts

Test the flipping control with a hosted element (dimension)

  •  It is not guaranteed to maintain the dimension, but you have a much better chance

Conclusion

Is this going to help you?

Maybe:

  • Obviously it only allows you to flip components one by one.
  • As the flip controls will mirror about the component origin, it may not end up exactly where you need it - but you can then move it

  • It will try to maintain any cutting and joining that you have done
  • It may warn you that joined elements no longer intersect - and you should have the option to unjoin or maintain the join (if the elements will later intersect again)
  • I have not tested the implications for Dynamo - I have no idea if it is possible to access the flip controls within Dynamo.

Revit Ideas Wishlist

There are already a couple of ideas relating to this on the Autodesk Revit Ideas Wishlist

Mirror Not Copy (for mechanical elements but applies to all)

MirrorElement Not Copy API


Sunday, 29 January 2017

Project Information in Revit Schedules

Those of you who read my previous blog post on Using Totals in Schedule Formulas, may have noted from the comments at the end that there was a subtle, undocumented change to schedules in Revit 2017.  I picked this up in discussions with Andy Milburn - so I thought we should share it clearly:

Revit 2016 Schedules

When defining a schedule in Revit 2016, the choice of category is in a drop-down menu in the lower left of the dialog box.  Just below it is a checkbox for including elements in linked Revit files - this is unticked by default.

If you click on the category drop-down menu for 'Select available fields from' you may get other options depending on the defined category for the schedule.  Typically, you will not see 'Project Information' in the list (For Casework, Rooms and Spaces are available).

However, once you tick the 'Include elements in links' checkbox, 'Project Information' suddenly becomes available;  not surprisingly RVT Links also shows up


The omission of  'Project Information' is presumably a long-standing bug, which most likely caused many users to not realise that it was possible to add Project Information to any schedule.

Revit 2017 Schedules

In Revit 2017, the dialog box has been redesigned so that not only are many text-based icons replaced with picture icons, but the 'Select available fields from' Category drop-down menu has been moved to the top left of the dialog box.  This is entirely logical once you get used to the change.


In the process, they have also fixed the bug, so that 'Project Information' fields are always available regardless of whether the 'Include elements in links' checkbox is ticked.

Now it should be easier for people to add Project Information to any schedule, as it is much more obvious. 

Thanks to Andy Milburn and Anthony Constantinidis for alerting me to some of these subtleties.